>> When completed, Huntington Bank Stadium became the first new football stadium in the Big Ten since 1960 and the first in NCAA FBS since 2006 (additional NCAA FBS stadiums have since been built).

>> The Gophers locker room is a state-of-the-art 60 x 25-yard area, shaped like a football with 120 custom-built lockers and 10 LCD televisions.

>> The Gophers have a private recruiting room that can accommodate 150 people.

>> The main high-definition video display in the stadium is one of the largest in college sports at approximately 48 feet high by 108 feet wide. It boasts Daktronics HD-16 technology and was the first of its kind in the Big Ten Conference.

>> The University achieved LEED certification (Leadership in Energy and Environmental Design) for Huntington Bank Stadium, making it the first LEED certified college football stadium in America. The certification is achieved by accumulating credits for various environmentally and sustainable efforts in design and construction.

>> In addition to Minnesota college football games, Huntington Bank Stadium has hosted Gopher hockey games, Monday Night Football (Minnesota vs. Chicago), NHL Stadium Series (Minnesota vs. Chicago), international soccer match (Manchester City vs. Olympiacos), MLB All-Star concert, U2, Rolling Stones, Beyonce, One Direction, Luke Bryan and Florida Georgia Line. The Minnesota Vikings (2014-15) and Minnesota United (2017-18) also played seasons at Huntington Bank Stadium while their new stadiums were being built.

Media wall image
Media wall image
Media wall image
Media wall image
Bryce Williams
overall, fans, stripe out, team
STADIUM SEATING
50,805Capacity of stadium
25,000Approx. number of seats with permanent chairbacks
37Private suites
57Loge boxes
1,250Outdoor Club seats
250Indoor Club seats
20,000Square-foot Club Room for game day and non-game day usage

STADIUM BY THE NUMBERS

1,300,000Total number of on-site work hours to complete stadium
24,000Cubic yards of cast-in-place concrete, enough to make a five-foot-wide sidewalk from Minneapolis to Rochester, MN (74 miles)
8,800Tons of structural steel, 97% of which is from recycled steel
4,019,760LED lights make up the video boards. The main scoreboard is one of the largest in college sports.
740,000Units of brick
2,020,000Feet of cable for telecom, broadcast, sound, fire alarm and security systems (382 miles)
2,210,000Feet of electrical wire/cable for power (418 miles)
900,000Square feet of finished space
7,500Light fixtures
350Televisions
38Miles of Aquatherm Blue Pipe filled with Glycol-based heat to keep the field from freezing
12Elevators and escalators
Narrator Image
Media wall image
Media wall image
Media wall image
huntington bank stadium
fans
ATTENDANCE RECORDS
1.54,147 vs. TCU9/13/15
2.54,062 vs. Nebraska10/17/15
3.53,917 vs. Ohio9/26/15
4.53,756 vs. Wisconsin11/30/19
5.53,090 vs. Wisconsin11/23/13
6.52,850 vs. Wisconsin11/28/15
7.52,823 vs. Kent State9/19/15
8.51,883 vs. Penn State11/9/19
9.51,382 vs. Iowa9/28/13
10.51,241 vs. Purdue10/18/14
fans